Install the boost pressure sensor on the charge air line
- Replace the sealing ring (1) for the boost pressures sensor.
Parts: Sealing ring
- Insert and install the boost pressure sensor (2).
- Tighten down screw (1).TIGHTENING TORQUES SPECIFICATION
Boost pressure sensor at the charge air line TS5x20 Tightening torque 4 Nm - Insert and install the wiring harness section for the engine (2).
- Ensure that the locks (1) engage audibly.
- Insert and connect the engine ventilation line (3).
The engine ventilation line (3) must engage audibly.
- Connect connectors (2) and lock.
The connector (2) must engage audibly.
- Connect connectors (1) and lock.
The connector (1) must engage audibly.
Follow-up work
- Refer to INSTALLING ACOUSTIC COVER .



