If installed: Fasten the active stabilizer (additional work for ARS)
- Position the wiring harness mounting and the ground cable.
- Tighten down screw (1).TIGHTENING TORQUES SPECIFICATION
Front active stabilizer cable with ground strap to holder tightening torque 8 Nm - Connect connectors (1) and (2) and lock.
- Tighten the bolt (1) of the wiring harness mounting on the front axle support.TIGHTENING TORQUES SPECIFICATION
Active stabilizer connector bracket to front axle support tightening torque 8 Nm Install the cover of the steering assembly on the right
NOTE: Description is for left component only. Procedure on the right side is identical.Install the cover of the steering assembly
NOTE: To provide a better overview: Schematic diagram with partially hidden components. - Insert the cover (1).
- Tighten all bolts (arrows).TIGHTENING TORQUES SPECIFICATION
Cover, steering unit screw Tightening torque 3 Nm Install the front section of the front right wheel arch cover
NOTE: Description is for left component only. Procedure on the right side is identical.Installing the front section of the front wheel arch cover
NOTE: To provide a better overview: Schematic diagram with partially hidden components. - Guide in the front section (1) of the front wheel arch cover.
- Tighten screws (arrows).TIGHTENING TORQUES SPECIFICATION
Wheel arch cover screw 3 Nm Plastic nut 2.6 Nm




