Install electric heater
- Guide the electric heater (2) in toward the top.
- Connect and lock the coolant hoses (1) on the connections of the electric heater (2).
- Guide the electric heater (1) in toward the top and clip it into the ball head (2).
- Tighten down screw (1).TIGHTENING TORQUES SPECIFICATION
Electrical heating to holder/body Nut M6 Tightening torque 8 Nm Hexagon screw
M6x16Tightening torque 8 Nm Torx screw M6x12 Tightening torque 7.6 Nm - Tighten the nut (2).TIGHTENING TORQUES SPECIFICATION
Electrical heating to holder/body Nut M6 Tightening torque 8 Nm Hexagon screw
M6x16Tightening torque 8 Nm Torx screw M6x12 Tightening torque 7.6 Nm NOTE: DANGER
Potential equalization in high-voltage system.
Mortal hazard if the potential equalization screw connection is not correct!- Observe the safety requirements for the potential equalization screw connection.
- Clean contact faces and have then checked by a second person.
- Tighten the screws/nuts for potential equalization with torque; have a second person check the torque.
- Correct execution of these tasks must be documented in the vehicle records by both persons.
- Fit the equipotential bonding line and tighten nut (1).TIGHTENING TORQUES SPECIFICATION
Equipotential bonding line on body Hexagon nut M6 Tightening torque 8.0 Nm - Connect connectors (2) and lock.
- Clip the high-voltage cable (3) in at the electric heater.
- Clip the high-voltage cable (1) in at the electric heater (2) at the marked points (3).
- Clip the high-voltage cables (1) in at the electric heater (2) at the marked points (3).
- Connect and lock the high-voltage connectors (1).
- Insert and install the holder (2).
- Tighten down screws (1).
- Position holder (2).
- Tighten down screw (1).
- Guide in and install the high-voltage connector (2).
- Tighten the screws (1) crosswise up to the high-voltage connector (2).
- Tighten screws (1) crosswise.
Follow-up work
- Fill the HIGH-TEMPERATURE COOLING SYSTEM with the vacuum filling equipment
- Vent the HIGH-TEMPERATURE COOLANT SYSTEM .
- Check the HIGH-TEMPERATURE COOLING SYSTEM for watertightness.
- Install rear UNDERBODY PROTECTION .
- Install the STIFFENING PLATE .
- ACTIVATE high-voltage system.
- Install flap in right luggage compartment TRIM PANEL .
- Reconnect all battery GROUND LEADS .









