Installing the output shaft
NOTE:
TECHNICAL INFORMATION
The installation note for front gearing must be observed at all times.
The installation note for front gearing must be observed at all times.
- Replace the collar bolt (1)
and the compression spring (2)
.
Parts: Collar bolt and compression spring
- Note installation position of compression spring (2) .
- Keep the collar bolt (1)
and the front gearing of the wheel bearing and the output shaft clean and free of grease.
- Position the output shaft (1) on the wheel bearing from the center of the vehicle.
- Tie up output shaft (1)
.
Do not leave the output shaft (1) hanging on joint!
- Hand-tighten the collar bolt (1)
with the compression spring.NOTE: TECHNICAL INFORMATION
The front gearing of the wheel bearing and output shaft must be installed in an interlocking position (tooth-in-tooth). - Ensure positive locking by mutual twisting of the wheel bearing (1) and the output shaft (2) .
- Press brake pedal.
- Tighten the collar bolt.TIGHTENING TORQUES SPECIFICATION
Output shaft to wheel bearing M16
Replace the collar bolt.Jointing torque 210 Nm Angle of rotation 90°
Follow-up Work
- Grease the WHEEL HUB
- Replace the left and right drive flange RADIAL SHAFT SEAL .
- Install rear AXLE DIFFERENTIAL .
- Secure the rear axle differential left and right OUTPUT SHAFT .
- Check/top up the rear axle differential OIL LEVEL .
- Secure the rear axle differential PROPELLER SHAFT .
- Install the rear HEAT SHIELD .
- Install EXHAUST SYSTEM .
- Install the left and right camber control arm COVER .
- Mount the WHEEL .



