Removing the wiring harness section of the blow-off valve for cylinders 1-4
WARNING:
Hot surfaces.
Risk of burning!
Risk of burning!
- Perform all work only on components that have cooled down.
Preliminary work
- Refer to DISCONNECTING ALL BATTERY GROUND LEADS .
- Refer to REMOVING THE ACOUSTIC COVER .
- Refer to REMOVING THE COVER OF THE RIGHT DME CONTROL UNIT .
- Refer to REMOVING RIGHT INTAKE FILTER HOUSING WITH RIGHT FRONT-END STRUT .
- Refer to PARTIALLY RELEASING THE RIGHT CHARGE AIR LINE .
- Refer to REMOVING THE CLEAN AIR PIPE OF CYLINDER BANK 1 .
- Unclip wiring harness section in area (1).
- Unlock plug connection (2) and disconnect.
- Open the guide of the wiring harness section in area (1).
- Feed the wiring harness section out of the guide.
- Unlock plug connection (1) and disconnect.
- Guide the wiring harness section out.


