Install venting unit
- Check contact surface degassing unit (1) for contamination and clean if required.
- Insert venting unit (1) in arrow direction.
- Tighten the screws (1).TIGHTENING TORQUES SPECIFICATION
Degassing unit on lower housing M5x10 Tightening torque 4.5 Nm
Follow-up work
- Install the battery management ELECTRONICS (SME) including holder.
- Install the high-voltage battery unit LID .
- Perform EOS TEST

