Preparing New Parts
Further information is available.
NOTE:
TECHNICAL INFORMATION
Structural adhesive bonding.
Observe preparation of bonding surfaces.
For additional information see: BMW/MINI BONDING INSTRUCTIONS (530I 2017-2022, 530I XDRIVE 2017-2022, 530E PHEV 2018-2022, 530E XDRIVE PHEV 2018-2022, 540I 2017-2022, 540I XDRIVE 2017-2022, M550I XDRIVE 2018-2022) .
Structural adhesive bonding.
Observe preparation of bonding surfaces.
For additional information see: BMW/MINI BONDING INSTRUCTIONS (530I 2017-2022, 530I XDRIVE 2017-2022, 530E PHEV 2018-2022, 530E XDRIVE PHEV 2018-2022, 540I 2017-2022, 540I XDRIVE 2017-2022, M550I XDRIVE 2018-2022) .
- Prepare the areas (1) for MAG welding. The MAG weld seams have an approximate length of 15 mm.
- MAG weld the areas (1).
- Adjust new parts to fit with alignment bracket or universal mount and secure.
- Prepare areas (1) and (2) for structural adhesive bonding of aluminum on aluminum.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Transferring hole pattern. - In the areas (1), transfer hole pattern of engine mount on the spring support. Drill out holes to dia. 6.8 mm.
- In the areas (2), transfer hole pattern of engine mount on the spring support. Drill out holes to dia. 6.8 mm.
- Prepare area (1) for structural bonding of steel on aluminum.
- Transfer the hole pattern in areas (1) from the engine mount to the carrier support. Drill out holes to dia. 6.8 mm.
- Prepare areas (1) and (2) for structural adhesive bonding of steel to aluminum.
- In the areas (1) and (2) transfer hole pattern of wheel well on the spring support. Drill out holes to dia. 6.8 mm.
- Prepare area (1) for structural bonding of steel on aluminum.
- In the areas (1), transfer hole pattern of engine bulkhead on the spring support. Drill out holes to dia. 6.8 mm.
- Prepare areas (1) and (2) for structural bonding of steel on aluminum.
- Set bores with dia. 6.8 mm on the new parts in the areas (1). Carry out bores in number and position analogous to the series.
- Prepare area (1) for structural bonding of steel on aluminum.
- In the areas (1), set 12 bores with Ø 6.8 mm on the new parts analogue to the standard production.
- Prepare areas (2) for structure bonding steel on steel.
- In the areas (2), set 2 bores with Ø 6.8 mm on the new parts analogue to the standard production.
- Prepare areas (3) and (4) for steel on steel structure bonding.
- In the areas (3) and (4), set 4 bores Ø 4.2 mm as shown.
- Prepare the new part in the areas (1) for joining with MAG weld. The MAG weld seams have a length of = 15 mm.
- Remove the adhesive residue in the areas (1).NOTE: TECHNICAL INFORMATION
For additional information see: SPOT-WELD BONDING STEEL COMPONENTS - (530I 2017-2022, 530I XDRIVE 2017-2022, 530E PHEV 2018-2022, 530E XDRIVE PHEV 2018-2022, 540I 2017-2022, 540I XDRIVE 2017-2022, M550I XDRIVE 2018-2022) . - Prepare spot-welded adhesive joints for the series for joining by welding in the areas (1).
- Remove new parts and deburr bores.
Check ground pins and replace if necessary
NOTE: Schematic diagram is for example purposes. Some parts may differ in certain details. - Check the ground pins (1) for stability and renew if necessary.









