Install 12-V dual storage battery
WARNING:
Incorrect screw connection of the battery cable.
Risk of fire!
Risk of fire!
- Make sure that the battery cable is screwed together with the correct nut.
- Install the 12 V dual storage system (3).
- Position the positive battery cable (2) on the positive terminal.
- Tighten nut (1).TIGHTENING TORQUES SPECIFICATION
Positive battery terminal to battery Nut Tightening torque 5 Nm Check
- Check the guide (1) and the retaining lugs (2) on the positive terminal cover (3) for damage.
Result
» Guides (1) or retaining lugs (2) are damaged.
Measure
- Replace positive terminal cover (3).
- Connect connectors (5) and lock.
- Install battery rollover protection bracket (4).
- Tighten nut (3).TIGHTENING TORQUES SPECIFICATION
Retaining bracket 12 V dual storage system Nut M8 Tightening torque 15 Nm - Insert positive terminal cover (2).
- Clip in latch mechanisms (1) on the positive terminal cover (2).
Follow-up Work
- Check the battery VENT HOLES .
- Install spring strut dome TENSION STRUT .
- Install cowl panel COVER .
- Install left and right WIPER ARM .
- Install the rear right engine compartment COVER .
- Connect all battery EARTH LEADS .
- Activate the 48 v ELECTRICAL SYSTEM .
- REGISTER battery exchange.


