Install high-voltage connection
- Check contact surfaces of high-voltage connection for contamination and clean if required.
- Press in the high-voltage connection (1) in the direction of the arrow.
- Tighten the screws (1).TIGHTENING TORQUES SPECIFICATION
High-voltage connector on lower housing section M5x10 Tightening torque 4.5 Nm - Tighten down screw (1).TIGHTENING TORQUES SPECIFICATION
High-voltage connector on lower housing section (shielding) M4x10 Tightening torque 2.4 Nm - Connect the connector (2) of the high-voltage interlock.
Follow-up work
- Install high-voltage CONNECT LINE .
- Install the SAFETY BOX including holder.
- Install the high-voltage battery unit LID .
- Perform EOS TEST


