Overview - Windshield Projection (Head-Up Display)
- Nut
- 8 Nm
- Quantity: 3
- Expanding Rivet
- For air duct
- Exterior Bracket
- For windshield projection control module
- Removing and installing. Refer to OUTER BRACKET, REMOVING AND INSTALLING .
- Bolt
- Tightening sequence. Refer to Fig 2.
- Replace after removing.
- Quantity: 2
- Instrument Panel
- Bolt
- 1 Nm
- Quantity: 5
- Upper Cover
- Removing and installing. Refer to WINDSHIELD PROJECTION HEAD UP DISPLAY CONTROL MODULE, REMOVING AND INSTALLING .
- Frame
- For upper cover
- Air Duct
- For windshield projection control module
- Expanding Rivet
- For air duct
- Bolt
- Tightening specifications and sequence. Refer to Fig 2.
- Windshield Projection Head Up Display Control Module -J898-
- Removing and installing. Refer to WINDSHIELD PROJECTION HEAD UP DISPLAY CONTROL MODULE, REMOVING AND INSTALLING .
- Calibrating. Refer to WINDSHIELD PROJECTION HEAD UP DISPLAY CONTROL MODULE, CALIBRATING .
- Bolt
- Tightening specifications and sequence. Refer to Fig 2.
- Replace after removing.
- Quantity: 2
- Interior Bracket
- For windshield projection control module
- Removing and installing. Refer to INNER BRACKET, REMOVING AND INSTALLING .
- Central Tube
- Nut
- 8 Nm
- Quantity: 3
Windshield Projection Head Up Display Control Module - Tightening Specification and Sequence
-- Tighten the bolts in the sequence shown.
| Bolts | Tightening Specification |
|---|---|
| -1- | 5.5 Nm |
| -2 and 3- | 4 Nm |

