Camshaft, Removing And Installing: Removing
- The cylinder head cover sealing surfaces on the cylinder head must not be worked on.
- During installation, all cable ties must be installed at the same location.
-- Remove the engine cover. Refer to ENGINE COVER, REMOVING AND INSTALLING .
-- Remove the nuts -arrows- and the bolt -2-.
-- Free up the wires and remove the heat shield -1- (example illustration).
-- Remove the bolts -2- and move the bracket to the side.
-- Remove the noise insulation. Refer to OVERVIEW - NOISE INSULATION .
-- Remove the upper timing chain cover. Refer to UPPER TIMING CHAIN COVER, REMOVING AND INSTALLING .
-- Remove the air filter housing. Refer to AIR FILTER HOUSING, REMOVING AND INSTALLING .
-- Disconnect the connector -2- for the Oxygen Sensor 1 After Catalytic Converter -GX7- -1- and free up the wires.
-- Disconnect the connectors and free up the wires.
1 - For the Turbocharger Recirculation Valve -N249-
3 - For Charge Air Pressure Control Module -GX34-
-- Press the release buttons on both sides and remove the crankcase ventilation hose -4-.
-- Disconnect the connectors and free up the wires.
- For the Camshaft Position Sensor 3 -G300-
- Crankcase Pressure Sensor -G1068- (for version)
- For the Oxygen Sensor 1 Before Catalytic Converter -GX10- (remove from the bracket to do so)
- For the EVAP Canister Purge Regulator Valve 1 -N80-
-- Remove the ignition coils. Refer to IGNITION COILS, REMOVING AND INSTALLING .
-- Remove the oil separator. Refer to OIL SEPARATOR, REMOVING AND INSTALLING .
-- Remove the high pressure pump. Refer to HIGH PRESSURE PUMP, REMOVING AND INSTALLING .
-- Remove the vacuum pump. Refer to VACUUM PUMP, REMOVING AND INSTALLING .
-- Open the heat shield boot.
-- Loosen the hose clamp -arrow- and remove the coolant hose.
-- Disconnect the connector -2- from the cam adjustment actuator.
-- Free up the vacuum hose -1- and the wires.
-- Release the catches in direction of -arrows-, remove the wiring duct -2- with the wiring harness and move to the side.
-- Loosen the hose clamp -2- and disconnect the hose for the EVAP system.
-- Lift the clip -3-, disconnect the coolant line -2- and free up from the cylinder head and push it toward the side.
-- Remove the vacuum hose -4-, disconnect the vacuum line -1- for the Intake Manifold Runner Control Valve -N316- and free it up at the cylinder head.
-- Remove the camshaft timing chain. Refer to CAMSHAFT TIMING CHAIN, REMOVING AND INSTALLING .
-- Apply the oil pump drive chain.
-- Install the : T10531/3 . In the "TDC point" the flat area -1- points upward. Install the : T10531/4 . Turn the crankshaft with a 32 mm open end wrench 90° counter-clockwise out of "TDC".
-- Reduce the intake camshaft pretension using the : T40427 in the direction of -arrow B-, pull the : T40271/2 out of the chain sprocket splines in direction of -arrow A-, and bring the intake camshaft into its resting position.
-- Reduce the exhaust camshaft pretension using the : T40427 in the direction of -arrow B-, pull the : T40271/1 out of the chain sprocket splines in direction of -arrow A-, and bring the intake camshaft into its resting position.
-- Remove the cylinder head cover bolts in -1 to 6- sequence.
-- Carefully loosen the cylinder head cover -2- from the bonding with a screwdriver -1- and remove it together with the camshafts.
- Pay attention that the camshafts do not fall out of the cylinder head cover.
-- Remove the camshaft and cover the open engine components.
-- If necessary for continuing work: mark the roller rocker lever and hydraulic lifter for reinstallation, remove them and place on a clean surface.














