Set up the engine on the mobile lifting table with the workshop crane: Notes
- Mount the engine with the workshop crane (1) on the mobile lifting table on the front axle.
Follow-up work:
- Refer to TIGHTENING THE SCREW CONNECTION ON ENGINE MOUNTING AT RIGHT .
- Refer to TIGHTENING THE SCREW CONNECTION ON ENGINE MOUNTING AT LEFT .
- Refer to CONNECTING THE TRANSMISSION TO THE ENGINE .
- Refer to FLANGE-MOUNTING TRANSMISSION
- Refer to LOCKING THE CONNECTOR WITH THE SEALING SLEEVE .
- Refer to CONNECTING THE CONNECTOR WITH THE VTG CONTROL UNIT .
- Refer to SECURING THE TORQUE CONVERTER
- Refer to TIGHTENING CONVERTER BOLT
- Refer to INSTALLING RUBBER COVERING OF THE TRANSFORMER SCREW CONNECTION .
- Refer to REPLACING THE RADIAL SHAFT SEAL .
- Refer to INSTALLING THE OUTPUT SHAFT .
- Refer to FASTENING THE OUTPUT SHAFT ON THE WHEEL BEARING .
