Installing the high-pressure line between the high-pressure pump and the high-pressure rail
- Guide in the high pressure line (4) in the mount (3) and install.
- Tighten the union nuts (arrows) with the special tool 0 495 280 (13 0140)
.TIGHTENING TORQUES SPECIFICATION
High pressure line between the rail and the high pressure pump M 14x1.5 Tightening torque 33 Nm - Feed in and install wiring harness section of the engine wiring harness (4).
The locks (3) must engage audibly.
- Connect connectors (1) and (2) and lock.
The connectors (1) and (2) must audibly engage.
Follow-up work
- Refer to INSTALL ALL IGNITION COILS .
- Refer to WHEN WORKING ON THE LAST CYLINDER: MOUNTING THE SERVICE OPENING IN THE SOUND INSULATION ON TOP OF THE ENGINE .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to DISCONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .

