Installing the high-voltage cable
- Feed in the high-voltage cable (2) from the bottom.
- Position the high-voltage cable (2) in the holder (1).
- Feed in the rubber grommets (4) of the high-voltage cable (3).
- Fasten the holder (2).
- Tighten nut (1).TIGHTENING TORQUES SPECIFICATION
Underbody planking on body Plastic nut Tightening torque 2.6 Nm - Position the cable clip below and tighten the nut (1).TIGHTENING TORQUES SPECIFICATION
Underbody planking on body Plastic nut Tightening torque 2.6 Nm - Insert the connector (3) of the high-voltage cable straight and tighten the screws (2).TIGHTENING TORQUES SPECIFICATION
High-voltage cable to electrical machine electronics M6x25 Tighten screws in crosswise sequence. Joining torque 3 Nm Tightening torque 8 Nm - Tighten nuts (1).TIGHTENING TORQUES SPECIFICATION
Holder for tension relief M6 Tightening torque 8 Nm - Position the holder (1) and lock it in the marked area.
- Feed in the rubber grommets (3) of the high-voltage cable.
- Connect connectors (2) and lock.
- Connect connectors (3) and lock.
- Connect connectors (1) and lock.
- Position the holder and tighten the screw (2).TIGHTENING TORQUES SPECIFICATION
Holder for tension relief M6 Tightening torque 8 Nm - Position the sealing frame (2).
- Tighten the screws (1).
- Position the line clip (2).
- Tighten nuts (1).TIGHTENING TORQUES SPECIFICATION
Underbody planking on body Plastic nut Tightening torque 2.6 Nm - Clip in the line clip (2) of the high-voltage cable (1).
- Position the cable clip (2).
- Tighten nuts (1).TIGHTENING TORQUES SPECIFICATION
Underbody planking on body Plastic nut Tightening torque 2.6 Nm - First feed in the line clip (2) with the two holders (1) to the top.
- Lock both the locks (1) by turning upwards.
- Connect connectors (3) and lock.
- Connect connectors (2) and lock.
- Position the holder and tighten the screws (1).TIGHTENING TORQUES SPECIFICATION
Holder for tension relief M6 Tightening torque 8 Nm
Follow-up work
- Fit the undercarriage HEAT INSULATION .
- Install the complete EXHAUST SYSTEM
- If installed: install the right, and on the left TORSION STRUT .
- Install the tunnel connect SUPPORTS
- Reconnect all battery GROUND LEADS .












