Install the cooler of the low-temperature coolant circuit
Further information is available.
NOTE:
TECHNICAL INFORMATION
Notes on work at the cooling system form the basis of these repair instructions and must be complied with at all times.
For additional information see: 17 00... INSTRUCTIONS FOR REPAIR WORK ON COOLING SYSTEM
Notes on work at the cooling system form the basis of these repair instructions and must be complied with at all times.
For additional information see: 17 00... INSTRUCTIONS FOR REPAIR WORK ON COOLING SYSTEM
NOTE:
TECHNICAL INFORMATION
Make sure that the connections are locked correctly. The locks must engage audibly.
Make sure that the connections are locked correctly. The locks must engage audibly.
- Guide in radiator of low-temperature coolant circuit (1) with radiator of high-temperature coolant circuit (2) and install.
- Connect the transmission oil feed line (1) to the transmission oil cooler and lock.
- Tighten screw (1) bottom cooling module, left.
Tightening torques
Radiator to cooling module, bottom TS6x20 Tightening torque 6 Nm - Tighten screw (1) bottom cooling module, right.
Tightening torques
Radiator to cooling module, bottom TS6x20 Tightening torque 6 Nm - Insert in and install the cover (3) on the bottom left-hand cooling module.
- Ensure that the lock (2) engages audibly.
- Ensure that the lock (1) engages audibly.
- Ensure that the locks (1) engage audibly.
- Insert and install the cover (3) on the bottom right-hand coding module.
- Ensure that the locking mechanism (2) engages audibly
- Ensure that the lock (1) engages audibly.
- Connect and lock coolant line (1).
- Make sure that the coding line (1) engages audibly.
- Feed in air duct (2) in direction of arrow and install.
- Secure clamps (1).
- Guide in and install cover (2), front right.
- Secure clamps.
- Tighten down screws (1).
Tightening torques
Cover to front bumper screw Tightening torque 3 Nm - Thread in air duct (1) and install.
- Tighten screws (arrows).
Tightening torques
Cover to front bumper screw Tightening torque 3 Nm - Feed in and install the electric coolant pump (2).
- Secure the holder (1).
- Secure damps (3).
- Connect and lock coolant line (1).
- Mate sure that the cooling line (1) engages audibly.
- Connect and lock coolant line (1).
- Make sure that the cooling lie (1) engages audibly. NOTE: The following step(s) must be performed if the listed component(s) is/are installed.
- Connect and lock coolant line (3).
- Connect and lock coolant line (2).
- Connect and lock coolant line (1).
- Make sure that all coolant lines engage audibly.
- Feed in and install the cower (3) in the cooling module above.
- Ensure that the locks (2) engage audibly.
- Ensure that the locks (1) engage audibly.
Follow-up work
- Refer to INSTALL FAN COWL .
- Refer to INSTALL THE REAR TOP CROSS CONNECTION .
- Refer to INSTALL FRONT CROSS CONNECTION .
- Refer to INSTALLING BOTH FRONT-END STRUTS
- Refer to INSTALLING THE COVER ON THE LEFT AND RIGHT IN THE ENGINE COMPARTMENT AT THE TOP
- Refer to FILL AND VENT THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to FILL AND VENT THE LOW-TEMPERATURE COOLANT CIRCUIT .
- Refer to CHECKING/TOPPING UP THE OIL LEVEL IN THE AUTOMATIC TRANSMISSION .
- Refer to INSTALLING THE UNDERBODY PROTECTION OF THE STEERING GEAR OR THE FRONT THRUST FIELD .
- Refer to INSTALL THE FRONT UNDERBODY PROTECTION OR FRONT THRUST FIELD .
- Refer to INSTALL REAR UNDERBODY PROTECTION .















