Perform Flushing 2
- Start Flushing 2 on the A/C service station.
- Perform Flushing 2 for at least 30 minutes.
Check
- Once Flushing 2 is complete, check whether the refrigerant in the sight glass on the A/C service station is clean:
Result
» Refrigerant in sight glass is clean.
Measure
- Both flushings are complete.
Result
» Refrigerant in sight glass is not yet clean.
Measure
- Fully repeat Flushing 2.
Follow-up work
- Remove all SPECIAL TOOLS .
- Install the electric A/C COMPRESSOR (EKK).
- Install control unit BRACKET .
- Install the integrated POWER SUPPLY MODULE (PDM).
- Install the DME CONTROL UNIT .
- Install acoustic COVER .
- Connect the COOLANT LINES for the low-temperature coolant circuit.
- Fill the high-temperature COOLING SYSTEM with the vacuum fill equipment
- Vent the high-temperature COOLANT SYSTEM .
- Check the high-temperature COOLING SYSTEM for watertightness.
- Install the UNDERBODY PROTECTION of the steering gear or the front thrust field.
- Install the front UNDERBODY PROTECTION or front thrust field.
- Install EXPANSION VALVE .
- EVACUATE and charge conditioning.
- Reconnect all battery GROUND LEADS .
- Delete FAULT MEMORY