Install the charging power socket
- Guide the high-voltage starter charging cable (4) into position.WARNING: Potential equalization in high-voltage system.
Mortal hazard if the potential equalization screw connection is not correct!- Observe the safety requirements for the potential equalization screw connection.
- Clean contact faces and have then checked by a second person.
- Tighten the screws/nuts for potential equalization with torque; have a second person check the torque.
- Correct execution of these tasks must be documented in the vehicle records by both persons.
- Tighten nut (2).TIGHTENING TORQUES SPECIFICATION
Holder on wheel well Plastic nut M6 Tightening torque 2.6 Nm - Clip in the holder (3).
- Tighten nut (1).TIGHTENING TORQUES SPECIFICATION
Potential equalization screw connection on wheel well M6 Tightening torque 8 Nm - Secure the line clip (2) on the high-voltage charging cable (3).
- Clip in the line clip (1).
- Plug connection (1) at the convenience charging electronics (KLE) (2) and lock.
- Insert and clip in the retaining strap (2).
- Connect plug connection (1) and lock.
- Position the charging power socket (4).
- Tighten down screws (1).TIGHTENING TORQUES SPECIFICATION
Holder for high-voltage charging socket Nut M6 Tightening torque 6 Nm - Connect plug connection (2) and lock.
- Connect plug connection (3) and lock.
Follow-up work
- Install the high-voltage charging socket COVER HOUSING .
- Raise front axle SUPPORT .
- Tighten the left and right front axle support SCREWS .
- Secure the bottom wishbone SPRING STRUT .
- Secure the swivel bearing top WISHBONE .
- Remove the mobile LIFTING TABLE .
- Attach the steering gear UNIVERSAL JOINT .
- If installed: connect the active stabilizer CONNECTOR
- Install the left and right steering assembly COVER .
- Secure front right and left BRAKE HOSE .
- Secure the left and right to the anti-roll bar anti-roll bar LINK .
- If installed: install the stationary heating SILENCER .
- Install the front left and bottom right wheel arch COVER
- Install left and right brake VENTILATION DUCT .
- Secure the front axle support EPS WIRING HARNESS .
- Install the left and right engine mount REINFORCEMENT STRUT
- Install the UNDERBODY PROTECTION of the steering gear or the front thrust field
- Install the front UNDERBODY PROTECTION/FRONT THRUST FIELD
- Reconnect all battery GROUND LEADS .
- ACTIVATE high-voltage system.




