Removing both timing chains and installing or replacing them
Prerequisite
- Remove and install front axle complete with engine and transmission.
Remove and install the engine on the front axle
WARNING:
Working on fuel system.
Risk of fire! Danger of explosion!
Risk of fire! Danger of explosion!
- When working on the fuel system, make sure the workstation has sufficient ventilation, e.g., by means of extraction.
- Tightly seal off open lines and connections; collect any leakage fuel directly at the point of exit.
- No fire, sparks, open flames or smoking.
NOTE:
TECHNICAL INFORMATION
Collect and dispose of emerging fluids. Observe country-specific waste disposal regulations.
Collect and dispose of emerging fluids. Observe country-specific waste disposal regulations.
Preliminary work
- Refer to MOUNTING THE ENGINE TO THE ENGINE SUPPORT BRACKET .
- Refer to RELEASING THE OIL DRAIN PLUG .
- Refer to REMOVING DRIVE BELT .
- Refer to REMOVING THE BELT TENSIONER .
- Refer to REMOVING THE BELT PULLEY ON THE TORSIONAL VIBRATION DAMPER .
- Refer to REMOVING THE COOLANT PUMP .
- Refer to RELEASING LEFT CHARGE AIR LINE PARTIALLY .
- Refer to PARTIALLY RELEASING THE RIGHT CHARGE AIR LINE .
- Refer to REMOVING THE COOLANT EXPANSION TANK FOR THE LOW-TEMPERATURE COOLANT CIRCUIT (CHARGE AIR COOLER) .
- Refer to REMOVING BOTH CHARGE AIR COOLERS .
- Refer to REMOVING THE CLEAN AIR PIPE OF CYLINDER BANK 1 .
- Refer to REMOVING THE CLEAN AIR PIPE OF CYLINDER BANK 2 .
- Refer to REMOVING THE IGNITION COILS OF CYLINDERS 1 AND 5 .
- Refer to REMOVING FUEL DELIVERY LINE .
- Refer to REMOVING IGNITION COIL OF CYLINDER BANK 2 .
- Refer to REMOVING LEFT HIGH PRESSURE PUMP .
- Refer to REMOVING THE HIGH-PRESSURE RAIL ON THE LEFT .
- Refer to REMOVING THE INJECTORS FOR CYLINDERS 5 TO 8 .
- Refer to REMOVING VANOS SOLENOID ACTUATOR, EXHAUST OF CYLINDER BANK 2 .
- Refer to REMOVING VANOS SOLENOID ACTUATOR, INTAKE OF CYLINDER BANK 2 .
- Refer to REMOVING THE LEFT AND RIGHT EXHAUST TURBOCHARGER .
- Refer to REMOVING FRONT HEAT SHIELD .
- Refer to REMOVING THE OIL FEED LINE AT THE EXHAUST TURBOCHARGER FOR CYLINDERS 5 TO 8 .
- Refer to REMOVING LEFT CYLINDER HEAD COVER .
- Refer to REMOVING THE SEALING CAP ON THE CYLINDER HEAD OF THE CYLINDER BANK 2 .
- Refer to MOVING THE CRANKSHAFT TO THE INSTALLATION POSITION TO ADJUST THE TIMINGS .
- Refer to CHECK THE VANOS ADJUSTER OF CYLINDER BANK 2 .
- Refer to RELAXING CHAIN TENSIONER ON BANK 2 FOR CHECKING OR SETTING TIMING .
- Refer to REMOVING HYDRAULIC CHAIN TENSIONER OF CYLINDER BANK 2 .
- Refer to PRELOADING THE TIMING CHAIN OF CYLINDER BANK 2 .
- Refer to FIXING THE ENGINE IN THE INSTALLATION POSITION ON CYLINDER 1 (SET VALVE TIMINGS) .
- Refer to REMOVING BOTH LEFT VANOS ADJUSTERS .
- Refer to REMOVING SPECIAL TOOL FOR FIXING CAMSHAFTS IN POSITION ON BANK 2 .
- Refer to REMOVING SPECIAL TOOL TO PRETENSION TIMING CHAIN ON CYLINDER BANK 2 .
- Refer to REMOVING LEFT CYLINDER HEAD .
- Refer to REMOVING IGNITION COIL OF CYLINDER BANK 1 .
- Refer to REMOVING RIGHT HIGH-PRESSURE PUMP .
- Refer to REMOVING RIGHT RAIL .
- Refer to REMOVING THE INJECTORS FOR CYLINDERS 1 TO 4 .
- Refer to PARTIALLY RELEASING THE GUIDE TUBE FOR THE OIL DIPSTICK .
- Refer to REMOVING VANOS SOLENOID ACTUATOR, EXHAUST OF CYLINDER BANK 1 .
- Refer to REMOVING THE VANOS SOLENOID ACTUATOR INTAKE OF CYLINDER BANK 1 .
- Refer to REMOVING RIGHT CYLINDER HEAD COVER .
- Refer to REMOVING THE SEALING CAP ON THE CYLINDER HEAD OF THE CYLINDER BANK 1 .
- Refer to CHECKING THE VANOS ADJUSTER OF CYLINDER BANK 1 .
- Refer to RELIEVING THE CHAIN TENSIONER AT CYLINDER BANK 1 FOR CHECKING OR SETTING THE VALVE TIMINGS .
- Refer to REMOVING HYDRAULIC CHAIN TENSIONER OF CYLINDER BANK 1 .
- Refer to PRELOADING THE TIMING CHAIN OF CYLINDER BANK 1 .
- Refer to FIXING THE ENGINE IN THE INSTALLATION POSITION ON CYLINDER 1 (SET VALVE TIMINGS) .
- Refer to REMOVING BOTH RIGHT VANOS ADJUSTERS .
- Refer to REMOVING SPECIAL TOOL FOR FIXING CAMSHAFTS ON BANK 1 .
- Refer to REMOVING THE SPECIAL TOOL TO PRETENSION THE TIMING CHAIN AT CYLINDER BANK 1 .
- Refer to REMOVING RIGHT CYLINDER HEAD .
- Refer to REMOVING THE VIBRATION DAMPER .
- Refer to REMOVING LOWER OIL PAN SECTION .
- Refer to REMOVING OIL PUMP .
- Refer to REMOVING FRONT AXLE DIFFERENTIAL .
- Refer to REMOVING UPPER OIL SUMP SECTION, ENGINE REMOVED .
- Refer to REMOVING TIMING CASE COVER, BOTTOM .
- Remove the slide rail (1).
Remove the tensioning rail of the timing chain for cylinder 1-4
- Remove the tensioning rail (1) with the timing chain (2) from the crankshaft gearing.
Removing the slide rail of the timing chain for cylinders 5 to 8
- Remove the slide rail (1).
Remove the tensioning rail of the timing chain for cylinder 5-8
- Remove the tensioning rail (1) with the timing chain (2) from the crankshaft gearing.
Remove the gear from the crankshaft
- Replace the bearing screws (1).
Parts: Bearing screws
TIGHTENING TORQUES SPECIFICATION
| Bearing screw to engine block | ||
|---|---|---|
| Bearing screw M10x1.25 Replace the bearing screw. Clean the thread in the engine block with a screw tap. |
Tightening torque | 46 Nm |
- Clean the thread in the engine block with a screw tap.
- Replace the bearing screws (2).
Parts: Bearing screws
TIGHTENING TORQUES SPECIFICATION
| Bearing screw to engine block | ||
|---|---|---|
| Bearing screw M8x1.25 Replace the bearing screw. Clean the thread in the engine block with a screw tap. |
Tightening torque | 20 Nm |
- Clean the thread in the engine block with a screw tap.
- Replace the sprocket wheel (3).
Parts: Camshaft sprocket
- Detach the gear (1) using the special tools 0 490 798 (11 2 000) and 0 490 798 (11 2 000).
- Make sure that there are no metal chips or similar impurities in the area of the chain drive, clean if necessary.
Install the gear on the crankshaft
NOTE:
TECHNICAL INFORMATION
Wear protective gloves.
Wear protective gloves.
- Check Woodruff key (1) for damage, replace if necessary.
- Heat camshaft sprocket to a minimum of 60°C and a maximum of 150°C and mount on the crankshaft.
Install the tensioning rail of the timing chain for cylinder 5-8
- Position the tensioning rail (1) with the timing chain
(2) on the gearing of the crankshaft.
Install the guide rail of the timing chain for cylinders 5 to 8
- Attach and position the slide rail (1).
Install the tensioning rail of the timing chain for cylinder 1-4
- Position the tensioning rail (1) with timing chain on the gearing of the crankshaft.
- Attach and position the slide rail (1).
Follow-up work
- Refer to INSTALLING TIMING CASE COVER, BOTTOM .
- Refer to INSTALLING UPPER OIL SUMP SECTION (ENGINE REMOVED) .
- Refer to INSTALLING THE OIL FILTER ELEMENT .
- Refer to INSTALLING FRONT AXLE DIFFERENTIAL .
- Refer to INSTALLING OIL PUMP .
- Refer to INSTALLING THE LOWER OIL PAN SECTION .
- Refer to INSTALLING THE VIBRATION DAMPER .
- Refer to INSTALLING THE RIGHT CYLINDER HEAD .
- Refer to INSTALLING BOTH RIGHT VANOS ADJUSTERS .
- Refer to REMOVING THE SPECIAL TOOL TO PRETENSION THE TIMING CHAIN AT CYLINDER BANK 1 .
- Refer to INSTALLING THE HYDRAULIC CHAIN TENSIONER OF CYLINDER BANK 1 .
- Refer to INSTALLING THE SEALING CAP ON THE CYLINDER HEAD OF CYLINDER BANK 1 .
- Refer to INSTALLING THE CYLINDER HEAD COVER ON THE RIGHT .
- Refer to INSTALLING VANOS SOLENOID ACTUATOR, EXHAUST OF CYLINDER BANK 1 .
- Refer to INSTALLING THE VANOS SOLENOID ACTUATOR INTAKE OF CYLINDER BANK 1 .
- Refer to INSTALLING RIGHT HIGH PRESSURE PUMP .
- Refer to INSTALLING THE INJECTORS FOR THE CYLINDERS 1 TO 4 .
- Refer to INSTALLING THE RIGHT HIGH-PRESSURE RAIL .
- Refer to INSTALLING IGNITION COILS OF CYLINDER BANK 1 .
- Refer to PARTIALLY INSTALLING THE GUIDE TUBE FOR THE OIL DIPSTICK .
- Refer to INSTALLING THE LEFT CYLINDER HEAD .
- Refer to INSTALLING BOTH LEFT VANOS ADJUSTERS .
- Refer to REMOVING SPECIAL TOOL TO PRETENSION TIMING CHAIN ON CYLINDER BANK 2 .
- Refer to INSTALLING THE HYDRAULIC CHAIN TENSIONER OF CYLINDER BANK 2 .
- Refer to INSTALLING THE SEALING CAP ON THE CYLINDER HEAD OF CYLINDER BANK 2 .
- Refer to INSTALLING THE LEFT CYLINDER HEAD COVER .
- Refer to INSTALLING OIL FEED LINE ON EXHAUST TURBOCHARGER CYLINDERS 5 TO 8 .
- Refer to INSTALLING VANOS SOLENOID ACTUATOR, INTAKE OF CYLINDER BANK 2 .
- Refer to INSTALLING THE VANOS SOLENOID ACTUATOR EXHAUST OF CYLINDER BANK 2 .
- Refer to INSTALLING THE LEFT HIGH PRESSURE PUMP .
- Refer to INSTALLING FUEL DELIVERY LINE .
- Refer to INSTALLING THE IGNITION COILS OF CYLINDER BANK 2 .
- Refer to INSTALLING BOTH EXHAUST TURBOCHARGERS .
- Refer to INSTALLING FUEL DELIVERY LINE .
- Refer to INSTALLING THE IGNITION COILS OF CYLINDERS 1 AND 5 .
- Refer to INSTALLING THE CLEAN AIR PIPE OF CYLINDER BANK 2 .
- Refer to INSTALLING CLEAN AIR PIPE OF CYLINDER BANK 1 .
- Refer to INSTALLING BOTH CHARGE AIR COOLERS .
- Refer to INSTALLING THE COOLANT EXPANSION TANK FOR THE LOW-TEMPERATURE COOLANT CIRCUIT (CHARGE AIR COOLER) .
- Refer to CONNECTING THE LEFT CHARGE AIR LINE TO THE EXHAUST TURBOCHARGER .
- Refer to CONNECTING THE RIGHT CHARGE AIR LINE TO THE EXHAUST TURBOCHARGER .
- Refer to INSTALLING COOLANT PUMPS .
- Refer to INSTALLING THE BELT PULLEY ON THE TORSIONAL VIBRATION DAMPER .
- Refer to INSTALLING THE BELT TENSIONER .
- Refer to INSTALLING DRIVE BELT .
- Refer to REMOVING THE ENGINE FROM THE ENGINE SUPPORT BRACKET .